Level 1: Factory Witness Testing (FWT)
Level 1 commissioning, or the Factory Acceptance Testing (FAT) phase, involves a rigorous review of the Owner’s Project Requirements (OPR) and Basis of Design (BOD) to ensure alignment with operational goals. We conduct thorough submittal reviews and perform Factory Witness Testing at the manufacturer's facility to verify that critical infrastructure—such as UPS systems, switchgear, and CRAC units—meets specified performance standards before it even reaches the site. This proactive approach identifies defects early, minimizing field delays and establishing a robust technical baseline for the entire project lifecycle.